Development of buildings started but not completed. A dble 30'x40' garage with cement pad is insul, dry walled, clg fans, 200 amp breaker panel. Guest cottage is 20'x22'. All materials to complete the cottage are on site. Wiring was started, panel in place. Walls are studded. House 40'x40' is framed, on a full wood foundation with concrete footings ready for wood floor. Main floor ready for develop. Tyvek on ext ready for wndws, doors. Dug well 75' and septic instd. Lot size to be verified.
Property Summary:
Category:House
Bedrooms:0
Bathrooms:0
Garage:0